HOME|RESIDENTS|BUSINESS|VISITORS|GOVERNMENT|FORMS|FAQs|CONTACT US
Home > Government > Boards and Commissions > Planning Commission > 1999 > Staff Reports > CPD99-002V
City of Rockville Planning Commission

CITY OF ROCKVILLE PLANNING DIVISION

STAFF REPORT

July 19, 1999

SUBJECT:

Detailed Application for Comprehensive Planned Development CPD99-002V


Applicant:                    
Charles Covell - Bozzuto Homes

6401 Golden Triangle Drive, Suite 200

Greenbelt, MD 20770


Date Filed: May 17, 1999


Property Location: North of Redland Road, east of Gaither Road


REQUEST:



The applicant seeks Detailed Stage (final) approval to allow development of 137 dwelling units and the accompanying streets. The application includes 47 attached townhouse dwelling units and 90 condominium units, 30 in each of three buildings. Of the aforementioned 90-unit multi-family total, there are six Moderately Priced Dwelling Units (MPDUs). There are two of these MPDUs per multi-family building.


PREVIOUS RELATED ACTIONS:

·            CPD95-0002, Concept Plan Application for Comprehensive Planned Development approved by the Mayor and Council, July 8, 1996.

·            CPD96-002A through CDP99-002T, Detailed Plan Applications for Comprehensive Planned Development for Phases I, II, and III of the King Farm development.  All were approved by the Planning Commission.



STAFF RECOMMENDATION:

Approval is recommended, subject to the following conditions:

 

1.   Submission, for approval by the Chief of Planning, of eleven (11) copies of the site plan, revised according to Planning Commission Exhibit A, including, but not limited, to the following:

a. Use of combined wheelchair ramps at all intersections where possible.
b. Adjustment to storm drain layout as directed by DPW.
c. Adjustment of street tree, fire hydrant and street light locations for safety reasons as directed by Public Works.
d. Location of street trees 15 feet from existing light poles.
e. Adjustment of corner truncations as directed by Public Works.

 

2. Submission, for approval by the Department of Public Works (DPW), of the following detailed plans, studies and computations:

a. Storm drain and paving plans for public and private roads, including grade establishment as appropriate, street lighting and landscaping. Storm drain study with computations and drainage area map to include private surface easements.
b. Stormwater management (SWM)/Best Management Practices (BMP) computations and easement locations.
c.  Sediment control plans for all disturbed areas. Watkins Pond shall not be used to provide sediment control.
d. Site plan including existing (rough graded) proposed contours, proposed improvements, (roads, houses, etc.). These grading plans must be submitted at the time of the Inspection Services permit application for house construction and prior to issuance of single-family dwelling unit permits.
e. All detailed engineering plans must be on 24" x 36" mylars and be at a 1"=30' scale. All public improvements to be submitted on City base sheets.

 

3. That all plans are coordinated and consistent - including BMP, sediment control, forest conservation, storm drain and paving, site plan and landscape plan.

 

4. Submission of WSSC plans with the first submission of storm drain and paving plans.  Where known, show final WSSC easements on plats. Obtain permission as required from WSSC for all encroachments in WSSC easements, and submit to City.

 

5. No refuse collection service will be provided from alleys. The city shall provide refuse service for all single-family dwellings. The city will not provide refuse service to the multi-family dwellings.

 

6. No building permits will be issued beyond 924,000 GPD sewage capacity of the Rockville Trunk Sewer, until the capacity has been increased.

 

7. Submission, for the approval of the Planning Commission, of a record plat application including all required easements and maintenance agreements, as well as dedication of property to the City of Rockville, including various open space sites. Lots requiring sewer ejector pumps should be disclosed on record plat.

 

8. Bonds must be posted and permits obtained from the Department of Public Works, WSSC, Transco, MDE, U.S. Army Corps of Engineers, and MDSHA as necessary.

 

9. Submission, for approval by the Chief of Planning, of eleven (11) copies of a detailed landscape plan to show the following:

a. Addition of trees to front and rear lawns of the townhouse building lots, as required by Subdivision Ordinance Section 25-748.
b. Plan revisions to address comments provided to the applicant by the City Forester.

10. Submission, for the approval of the Director of Community Planning and Development Services prior to the issuance of building permits, of a Sales Offering agreement to provide MPDUs.

 

11. Turn restrictions at Reserve Champion Drive and Lawson Way if required by the Director of DPW.

 

12.  The final plans must be signed to indicate approval of the Town Architect.

 

ANALYSIS:

Background

 

In July of 1996, the Mayor and Council approved Concept Plan Application CPD95-0002, authorizing development of the 430-acre King Farm as a major mixed-use development containing up to 3.2 million square feet of office space, 3,200 housing units and 125,000 square feet of neighborhood retail space. The tract is in the O-3, Restricted Office Zone, where a Comprehensive Planned Development is a voluntary optional method of development.

Property Description and Proposal

 

The subject property is located on 6.75 acres of vacant land, and is north of Redland Road and east of Gaither Road. The units that are proposed for this application are 47 attached townhouse dwellings and 90 multi-family condominium units. Of this total, there are 30 units in each of three buildings.

 

The multi-family units are clustered together at the north end of the development, and provide a mix of parking. Each one of the buildings has seven individual garages within the building.  In addition, there are a number of "tandem" space garage units within the parking lot. A tandem space is a double-length parking space that allows for parking of automobiles directly behind each other. A tandem space is typically two-car parking for an individual unit owner. A number of the individual garage parking associated with the multi-family units are arranged in a tandem layout. The rest of the parking is provided by surface parking adjacent to the buildings, as well as on-street parking. All of the on-street parking is provided on private streets.

 

The townhouse units are in the southern part of the development, and are primarily adjacent to Redland Road, continuing toward the middle of this development. The entire site is bisected by Lawson Way, which runs from Reserve Champion Drive through to Gaither Road. Lawson Way is the main gateway road through this section, and runs adjacent to a fountain/green space amenity for the project.

 

All of the townhouse units will have access from alleys to the rear of the properties.  This is a common occurrence for the King Farm development. Parking for the townhouse is provided within double rear-loaded garages, as well as parking on the private streets. In addition, four-foot wide sidewalks will be provided along all public and private street frontages.

 

Forest/Tree Preservation and Landscaping

 

The applicant will be required to address all of the Forester's concerns before building permits are issued. The landscape plan must be adjusted to add trees to the plan in the front and rear yard as required by the previously mentioned Subdivision Ordinance.

 

Transportation

 

As noted during the discussion of the Concept Plan, construction of all on-site streets and related sidewalks and landscaping shall be the responsibility of the applicant. No "off-site" transportation improvements are included or required for this application. All of the streets shown on this application will be built as part of this submittal, including the alleys that service the dwelling units.

 

As per the Concept plan, parking for the units will be provided by on-site garages, attached garages, driveways, surface lots and off-site parallel parking spaces on private roads.

 

NOTIFICATION

 

Notices were sent to 250 residences in King Farm, and the Woodley Gardens and College Gardens Civic Associations.

 

CONCLUSION

 

Staff believes that this application is consistent with the approved Concept Plan approved by the Mayor and Council for this area of the King Farm. As a result, staff recommends approval of Detailed Application CPD99-002V for 47 townhouses and 90 multi-family units in accordance with the conditions noted above.

 

Attachments