Voice Permits™ IVR User’s Guide
Voice Permits™ Line
240-314-5040
Voice Permits User's Guide (.pdf)
Call the automated Voice Permits™ IVR System for all of your construction related inspections except for Fire Marshal inspections.
In an ongoing commitment to improve customer service, Inspection Services Division has installed an Interactive Voice Response System for scheduling inspections, 24 hours a day, 7 days a week.
You will be prompted through the entire process. Press [*] at any time for more information.
Before Calling, You Will Need:
Choose From the Following Options:
Press [1] Schedule an Inspection
Press [2] Cancel an Inspection
Press [3] Obtain Inspection Results
Press [9] Repeat Main Menu
Press [0] To Speak with a Permit Tech
Press [*] Listen to General Information
Press [#] Disconnect and Hang Up
The Voice Permits™ system will prompt you through the steps below during your call. You may perform multiple transactions during each call. At the end of the call you will be issued a confirmation number. We recommend that you keep a record of your confirmation numbers and associated transactions in case they are needed for future reference.
Schedule an Inspection
Cancel an Inspection
After you have cancelled an inspection, you will be able to:
Obtain Inspection Results
After you have listened to the inspection results, you will be able to:
Inspection Codes
BUILDING CASE TYPE
PMB CASE TYPE
100 Footing 400 Interior groundwork
101 Foundation Footing 401 Exterior groundwork 102 Foundation walls 402 Ext meter crock/vault 103 Waterproofing 403 Meter release
104 Draintile 404 Water lateral
105 Backfill 405 Storm water lateral 106 Slab 406 Fire line 107 Floor Framing 407 Fire Line Flush Test 108 Residential framing 408 Water Line Flush Test 109 Close-in ceiling
409 Sewer lateral
110 Close-in walls 410 Stack test
111 Insulation 411 Interior water test 112 Structural steel 412 Exterior hydro
113 Reinforcing steel 413 Gas line 114 Concrete
414 Gas Line Pressure Test 115 Fireplace throat 415 Mercury test
116 Fireplace hearth 416 Close-in residential
198 Final
417 Close-in ceiling
199 Final Phase
418 Close-in wall
419 Backflow prevention DEMO CASE TYPE
420 Interior sub-meter 701 Inspection
498 FINAL 700 Final 499 FINAL PHASE
ELE CASE TYPE
SFD CASE TYPE
200 Pole construction 500 Footing
201 Trench 501 Foundation walls 202 Conduit in Slab 502 Waterproofing 203 TPF 503 Drain tile 204 Bonding 504 Backfill
205 Swimming Pool Bonding 505 Slab
206 Heavy-up 506 ELE trench 207 Sign 507 ELE TPF 208 Residential close-in 508 MEC/PMB gas line 209 Close-in ceiling 509 MEC/PMB Pressure Test 210 Close-in wall 510 PMB ext meter crock/vlt
211 Fire Pump
511 Interior groundwork 298 Final 512 Meter release
299 Final Phase 513 PMB water lateral
514 PMB sewer lateral
MEC CASE TYPE 515 PMB stack test 300 Gas line 516 PMB interior water test
301 Gasline/pressure test 517 PMB backflow prevention
302 Manufactured fireplace 518 Manuf fplc/wood stove
303 Wood stove
519 Fireplace throat
304 Close-in residential 520 Fireplace hearth
305 Close-in ceiling 521 Floor Framing 306 Close-in wall 522 BLD close-in 307 Fuel Tank Aboveground 523 ELE close-in 308 Fuel Tank Underground/Backfill 524 MEC close-in 398 Final 525 PMB close-in 399 Final Phase 526 Insulation
595 BUILDING FINAL OCC CASE TYPE 596 ELECTRICAL FINAL 600 Occupancy
597 MECHANICAL FINAL 601 Reinspection
598 PLUMBING FINAL 602 Phase Occupancy
599 Occupancy
NOTE:
If required, you must have an occupancy inspection from the Fire Marshal prior to requesting one from the Building Division. You must call the Fire Inspection Scheduling Line at 240-314-5041 at least 5 days prior to requesting an occupancy inspection.NOTE:
For SFD permits which have a sprinkler system, a Fire Marshal inspection is required prior to the building insulation and building occupancy inspections. You must call 240-314-5041 at least 5 days prior to requesting an inspection from the Fire Marshal.