Any proposed demolition in the City of Rockville of a single-family dwelling, duplex, or up to three-story townhouse may be subject to an Evaluation of Historic Significance to determine the historic significance of the structure(s) proposed for demolition.
Schedule an Inspection
After construction, schedule an inspection to ensure safety and code standards.
To schedule an inspection, call our 24-hour Voice Permits™ IVR System at 240-314-5040. Have your site-specific permit number and inspection code ready.
All utilities must be shut off and releases issued by all utility companies.