Temporary Structure

A temporary structure permit is needed for any temporary construction-related structures including temporary tents, trailers and offices.

 Tips: 
  • Don’t start work without an approved permit. A violation could result in a code enforcement violation with a penalty fee.
  • If the structure needs electricity including use of a generator, an additional electrical permit must be submitted.

MYGOVERNMENTONLINE Plan Submittal Requirements

Naming Convention - [house or building number] [street name] [#suite number if applicable] [name of the plans].  Example – 111marylandavenuebuildingplans or 111marylandavenue#suite200buildingplans

PDF files are strongly recommended for plans submissions.  1 file = 1 plan.
Please do not submit JPEG for plan submissions.
Plans should be submitted in black and white with no colors, to allow city staff to markup.
All drawings must be submitted in an unlocked PDF. If security settings are locked, city staff will be unable to edit, markup or approve.
Verification items such as trade licenses we can accept jpeg or tiffs image formats.

Note: There are no files size limitations for plan submission using mygovernmentonline.

 Still have questions? Contact: 

Permits and Inspections
phone.png
240-314-8240
location.png
111 Maryland Ave.
Rockville, MD 20850
hours.png
Monday - Friday
8:30 a.m. - 5:00 p.m.


 Permit Process


Gather Additional Documentation

Additional resources are required with the permit application.

Review the documents required for temporary structures applications.


Complete Permit Application

Complete the permit application and submit the application, additional materials and permit fee at:




Minimum permit fee is $150



Schedule an Inspection

After construction, schedule an inspection to ensure safety and code standards.

To schedule an inspection, log into MGO. Go to My Account and scroll down to My Permits. Click the Request button net to the permit for which you wish to schedule an inspection.