Public Safety, Rockville Reports, Transportation and Mobility

Baltimore Road Partially Resurfaced as Corridor Improvements Continue

November 1, 2022

With the first section of roadway resurfacing on Baltimore Road complete, construction of a shared-use path near Rockville High School is next up as work continues along the corridor between Rockville Town Center and the city’s east side.

Earlier this fall, city contractors completed paving Baltimore Road between First Street and Edmonston Drive. Curb bump outs were installed at Baltimore Road and Grandin Avenue, and at Baltimore Road and South Horners Lane. Crews also completed grading and preparation for the installation of a pervious shared-use path on the south side of Baltimore Road between the Rockville High School driveway and Twinbrook Parkway.

Upcoming work includes installing signage between First Street and Edmonston Drive, and continuing the installation of storm drain structure and pipe between Edmonston Drive and Avery Road.

To learn more about this project to improve safety and access on Baltimore Road, visit www.rockvillemd.gov/baltimoreroadproject.